PID Values for Trend Monitoring
Trend Monitoring can be used to see a chart of the PID Loop values. Values to add to a Trend:
-
_PIDxx_PV – Present Value of PID Loop
-
_PIDxx_MV – Manipulated Value (output value) of PID Loop
-
_PIDxx_SV – Set Value of PID Loop
Notes:
-
xx is number of the PID Loop to trend
-
See LP515 for some more information on trending.
LP109-5